
The park is built.Earn while the grid catches up.
If the grid connection is still years away, the park can mine Bitcoin in the meantime. Indicative revenue is €50–150k a month until connection terms arrive.
The solar park is ready. The grid is not.
Many Cyprus solar projects wait years for connection terms. Until then the park produces nothing and still carries cost.
A typical connection timeline in Cyprus
Idle park
A 5 MW park waiting three years
Mining park
3-year mining scenario for a 5 MW park
This is the cost of waiting. A park that mines Bitcoin can cover the solar investment before the connection arrives.
Indicative Bitcoin mining revenue
Based on a Bitcoin price of about €95,000, network difficulty, and Antminer specifications. These are conservative figures. Price appreciation is not included.
5 MW solar park → mining operation
How we calculate this
Daily BTC = (hashrate × 86400) / (difficulty × 2³²) × block rewardBESS options for longer mining hours
2-hour BESS
10 MWh for a 5 MW park
3-hour BESS
15 MWh for a 5 MW park
4-hour BESS
20 MWh for a 5 MW park
Once the park is connected, the same BESS can be used for grid services. That adds revenue and can shorten payback.
Already connected? Mine the curtailed energy
Curtailment on the Cyprus grid reached 45.8% in 2025. Parks are losing nearly half of potential revenue. That energy can be used for Bitcoin mining.
Curtailment in Cyprus, 2021–2025
The problem
Solar parks are curtailed at peak production when the grid cannot take the power. That energy is lost: no revenue, and in most cases no compensation.
The solution
Send curtailed energy to Bitcoin miners on site. Power that would otherwise earn nothing becomes cryptocurrency, at no extra energy cost.
Mining scenarios for a 5 MW solar park
Four ways to mine Bitcoin with solar, for different investment profiles
Waiting for connection
Park built, no grid terms yet
Advantages
Curtailment mining (no BESS)
Mine when the grid curtails the park
Advantages
BESS-enabled 24/7 mining
Continuous mining with storage
Advantages
Off-grid mining park
For parks without a grid connection
Advantages
Mining equipment we specify
ASIC miners specified for solar-powered operation
Antminer S19 XP
Antminer S19k Pro
Whatsminer M50S
Equipment finance is available
Through equipment partners we can arrange finance for mining hardware, with terms up to 24 months. Ask for current rates and availability.
How to start
From a solar park to a mining operation in 8–12 weeks
Site assessment
Solar output, curtailment pattern, and infrastructure
Equipment sizing
Miner count and the power infrastructure
Installation
Container, electrical connections, and cooling
Operations
Remote monitoring, maintenance, and revenue
Turn curtailed energy into Bitcoin
Stop losing curtailed energy. Mine it with solar power.