SolarFarms.cy
Cyprus land for solar development

Leverage Your Land forSolar Farm Revenue

Transform your Cyprus land into a profitable solar farm. Get an instant assessment of your plot's solar potential with real zone data and capacity calculations.

€15K-80K
Annual Lease Income
€200K-2M
Land Sale Premium
12-24
Months to RTB
25+
Years Income
Powered by Cyprus land registry data

Instant land solar assessment

Immediate feedback on solar potential, including zone checks, capacity estimates, and revenue projections.

Solar potential calculator

Zone check · capacity · revenue · instant results

1Upload a title deed or plot map (optional)

2Plot information

Hectares, acres, m², or donum

From your title deed or the planning department

Cyprus zoning quick reference

Γ3/G3
Agricultural — solar permitted
Γ4/G4
Agricultural — solar permitted
Α2/A2
Agricultural — solar permitted
ΒΕ/BE
Industrial — solar permitted
Η2/H2
Protected — no solar
Ζ/Z
Strict protection — no solar
Natura 2000
Environmental — restricted

3Your contact details

Free instant analysis — Cyprus land registry zoning, optional title-deed scan, and the grid map

Grid connection

Cyprus substation and grid situation

Live map of substation capacity and grid constraints in Cyprus. Use it to see whether your area has connection headroom before you commit to development.

Live dashboard

Source: ArcGIS dashboard (third party). Indicative only — confirm with EAC and TSOC during feasibility.Full screen
From a free assessment to Ready-to-Build

Feasibility study packages

Start with the free land assessment, then choose a fixed-fee package to check the site, grid connection, and licensing path. Fees are credited toward EPC if you build with us.

Package 01

Essential

Desktop pre-feasibility for landowners

€2,500
Fixed fee · ex VAT · authority fees separate

Landowners exploring solar potential before a site visit

  • Land title and zoning review (registry check)
  • Irradiance and yield estimate (PVsyst desktop simulation)
  • Indicative system capacity (kWp) from land area
  • Nearest substation and grid proximity check
  • High-level financial summary (indicative IRR and payback)
  • Written report (10–15 pages) and a 30-minute briefing call
  • Site visit — not included
  • Environmental screening — not included
7–10 business days
Payment: 50% on order · 50% on report delivery
Request Essential
Most popular
Package 02

Professional

Full feasibility with a site visit and grid pre-assessment

€7,500
Fixed fee · ex VAT · authority fees separate

Landowners ready to check grid, layout, and economics before licensing

  • Everything in Essential, plus:
  • On-site visit, land survey, and drone mapping
  • Full PVsyst simulation with shading and performance ratio
  • Grid connection pre-assessment (EAC/TSOC proximity and capacity)
  • Preliminary environmental screening (Natura 2000, EIA trigger)
  • Financial model (NPV, IRR, sensitivity, revenue scenarios)
  • Indicative layout and single-line diagram
  • Full report (30–40 pages) and a presentation
15–20 business days
Payment: 50% on order · 50% on report delivery
Request Professional
Package 03

Development Ready

Licensing-ready development package

€39,500
Fixed fee · ex VAT · authority fees separate · Up to 5 MWp

Landowners or investors pursuing Ready-to-Build status with permit support

  • Everything in Professional, plus:
  • Formal grid connection application to EAC/TSOC (filing fees separate)
  • Environmental impact assessment coordination (authority and consultant fees separate)
  • Planning permission application — Town Planning (permit fees separate)
  • CERA production licence application support (CERA fees separate)
  • Detailed electrical design and ETEK-signed drawings
  • Investor-grade bankable feasibility report
  • Dedicated project manager through pre-construction
  • Third-party authority, consultant, and study fees (itemised separately) — not included
3–6 months (subject to authority timelines)
Payment: 40% on order · 40% on application submission · 20% on the RTB milestone
Request Development Ready

Package fees are credited toward EPC if you proceed with Lighthief as contractor.

A free 30-minute consultation is included before any commitment.

Packages exclude fees paid directly to authorities (CERA, EAC/TSOC, Town Planning, Department of Environment). Those vary by project and are itemised on application.

What is Ready-to-Build (RTB)?

RTB projects already have permits, grid connection work, and approvals. They are ready for construction and investment.

RTB development process

1

Site assessment and design

Analysis and system design

2

Permits and approvals

Regulatory approvals and environmental clearances

3

Grid connection secured

Utility agreements and electrical infrastructure planned

4

Investment ready

Ready for financing and construction

RTB value creation

Raw land value€100K - €200K
+ Development costs€150K - €300K
+ Permit and grid value€100K - €200K
RTB project value€350K - €700K

Solar farm revenue by plot size

Examples of Cyprus solar farm revenue by land size

5 acres (2 hectares)
1-1.5 MW

Project economics

Total investment€800K – €1.2M
Annual revenue€180K – €240K
RTB value€400K – €600K
Timeline to RTB12–18 months to RTB

Your revenue options

Land lease: €8K–15K/year, or land sale: €200K–400K premium

Get a detailed analysis for this size
12 acres (5 hectares)
2.5-3.5 MW

Project economics

Total investment€2M – €4.2M
Annual revenue€450K – €840K
RTB value€1M – €2M
Timeline to RTB12–18 months to RTB

Your revenue options

Land lease: €20K–40K/year, or land sale: €500K–1M premium

Get a detailed analysis for this size
25 acres (10 hectares)
5-7 MW

Project economics

Total investment€4M – €8.4M
Annual revenue€900K – €1.68M
RTB value€2M – €4M
Timeline to RTB15–24 months to RTB

Your revenue options

Land lease: €40K–80K/year, or land sale: €1M–2M premium

Get a detailed analysis for this size

Why partner with Lighthief Cyprus?

From recycling pioneers to a full EPC contractor — we cover the solar lifecycle

Since 2017
Founded with recycling expertise
Cyprus HQ
Limassol headquarters and local market knowledge
Full lifecycle
From development to recycling
Proven results
8–12% IRR projections with a delivery track record

Ready to unlock your land’s solar potential?

Free instant assessment · feasibility packages from €2,500 · fees credited toward EPC